mirror of
https://git.in.rschanz.org/ryan77627/guix.git
synced 2024-12-24 05:18:07 -05:00
guix: tests: Increase timeout for test store connection.
THe gexp->derivation, store copy test involves building derivations which compile a bunch of Guile code, which can be quite slow on slow platforms like riscv64-linux. * guix/tests.scm (open-connection-for-tests): Increase #:timeout to 10 minutes. Change-Id: Iccfd976ce21a8902d776b36f17f5fb91b957d90d
This commit is contained in:
parent
f4aec15f47
commit
b4206a08ba
1 changed files with 2 additions and 2 deletions
|
@ -86,11 +86,11 @@ (define* (open-connection-for-tests #:optional (uri (%daemon-socket-uri)))
|
|||
#f))
|
||||
(let ((store (open-connection uri)))
|
||||
;; Make sure we build everything by ourselves. When we build something,
|
||||
;; it should take at most 5 minutes.
|
||||
;; it should take at most 10 minutes.
|
||||
(set-build-options store
|
||||
#:use-substitutes? #f
|
||||
#:substitute-urls (%test-substitute-urls)
|
||||
#:timeout (* 5 60))
|
||||
#:timeout (* 10 60))
|
||||
|
||||
;; Use the bootstrap Guile when running tests, so we don't end up
|
||||
;; building everything in the temporary test store.
|
||||
|
|
Loading…
Reference in a new issue